Full Home & Single Room Renovation

One contractor, start to handover.

Kitchens, bathrooms, basements and whole-home rebuilds — scoped in one place, sequenced in one order, run by one crew that does not disappear between trades.

A renovated kitchen with island seating and full-height cabinetry A renovated bathroom with a vanity, round mirror and glass shower A finished open living space with large windows
The Sequence

The order is the job. Not a preference.

Every renovation runs through the same five phases. Work done out of order gets undone.

  1. 01

    Strip out

    Demolition, disposal, and the first honest look at what is behind the walls.

  2. 02

    Structure & rough-in

    Framing, plumbing, electrical, HVAC — the work that gets inspected.

  3. 03

    Close up

    Insulation, vapour barrier, drywall, tape and prime.

  4. 04

    Finishes

    Flooring, cabinetry, tile, trim and paint, in that order.

  5. 05

    Handover

    Deficiencies cleared, everything tested, the space cleaned properly.

Room By Room

Three rooms carry most of the risk.

Kitchens, bathrooms and basements are where services, water and code all meet at once. This is what we do differently in each.

A renovated kitchen with large windows and full cabinetry

Kitchens

  • Layout and services moved to suit how you actually cook
  • Cabinetry, counters and backsplash specified together
  • Appliance fit confirmed before anything is ordered
  • Lighting split across the right circuits
A renovated bathroom with a glass shower enclosure

Bathrooms

  • Full waterproofing before a single tile goes on
  • Ventilation sized to the room, not to the cheapest fan
  • Fixtures set out against real clearances
  • Niches and benches framed in, not stuck on after
A finished lower-level living space

Basements & lower levels

  • Moisture dealt with before any framing starts
  • Ceiling height and egress checked before design
  • Insulation and vapour barrier to current code
  • Separate entrance where the layout allows one
Scoping The Job

Every project disrupts differently.

What actually varies between renovation types is trade count, permit likelihood and how much of your daily life the job takes. Click a row for what that means in practice.

Small in area and disproportionately complex: demolition, plumbing, electrical, waterproofing, tile, drywall and finish all inside a few square metres, in a strict order, with almost no room for two trades at once. A permit is usually required once plumbing is moved rather than replaced in place. If it is the only bathroom in the house, plan for that — this is the job where a second bathroom stops being a luxury.

The most trades of any single room and the biggest impact on daily life, because you lose cooking, washing-up and usually the main circulation route through the house at the same time. Cabinetry is the long lead item and it drives the schedule, so it is ordered at the front of the job rather than when the space is ready. Set up a temporary kitchen somewhere else before day one.

The least disruptive major project in a house, because the work is contained below the living space and you keep the rest of the home throughout. It is also the most permit-heavy: framing, electrical, insulation and egress all attract inspection, and a second suite adds fire separation and zoning on top. The gating questions are ceiling height and egress, and both are answered before quoting.

Every trade, in sequence, with the schedule as the main risk rather than any individual task. Most people move out for at least part of it — with services off and no working kitchen or bathroom for extended stretches, staying is possible but rarely sensible. In exchange it is the most efficient way to renovate: every wall is open once, so nothing gets opened twice.

No Surprises

What's in the quote, and what isn't.

Renovation budgets go wrong in the gap between what the homeowner assumed and what the contractor priced. This is our attempt to close that gap on paper.

In The Quote
  • Project management and trade coordination

    Booking, sequencing and supervising every trade is our job, not a line item you pay extra for.

  • Permit applications and inspection attendance

    We file, we meet the inspector, and we deal with anything on the report.

  • Daily protection and site cleanup

    Floors and pathways protected, debris removed as we go, not piled until the end.

  • Walkthrough and deficiency rectification

    The written list at handover gets cleared before the final invoice is due.

Priced Separately
  • Hidden conditions behind walls

    Knob-and-tube wiring, rot, mould or failed plumbing found during demo is priced as a written change order before we touch it.

  • Municipal permit fees and development charges

    Paid to the city at cost and shown separately; we do not mark them up.

  • Design drawings and engineering stamps

    Where a structural change needs an engineer, that is an independent professional you retain.

  • Appliances and owner-supplied fixtures

    Happy to install them; we do not warranty product we did not supply.

Scope Builder

Tell us the project. We'll show you the scope.

Three questions, and this builds the scope your quote would be written against. No prices here — those go in writing, after we have walked the property.

1. What are we renovating?
2. Is the layout changing?
3. Will you be living there?
Common Questions

Full Home Renovation, answered.

Still unsure about something? A quick call usually clears it up faster than email.

Talk to us

For a single room or a basement, almost always — we seal the work area, protect the pathways in and out, and keep the rest of the house yours. For a full gut, a kitchen with no cooking facilities for weeks, or anything with the water off for extended periods, most people move out for at least part of it. We tell you which situation you are in at quoting time so you can plan, rather than discovering it in week two.

We do. We prepare and file the application, meet the inspector on site at each required stage, and handle anything that comes back on the report. The municipal fees are passed through at cost and shown as their own line, not marked up. Where a structural change needs a stamped drawing, you retain the engineer directly and we work to what they issue.

It happens on most jobs and it is manageable — the cost is in when. A finish change before the material is ordered is usually free; the same change after installation means paying twice. Anything that alters the scope becomes a written change order with its own price and schedule impact, signed before we act on it. Nothing gets added to your invoice that you have not agreed to in writing first.

Against completed work, not against the calendar. A deposit to secure the schedule and order long-lead material, then progress payments tied to defined milestones — rough-in passed, drywall complete, and so on — with a meaningful final payment held until the walkthrough deficiency list is cleared. The full schedule is in the quote before you sign, and we do not ask for large sums ahead of the work they cover.